Home > Products > Ore Beneficiation Equipment > Cement Grinding Station
Cement Grinding Station

Cement Grinding Station

Online Service Connection < 60s, Email Reply Time < 24h

Specification: φ1.83×7φ4.6×14m

Processing Ability: 1 - 1000 t/h

Cement grinding station is an individual independent cement finished products production units of the formation of finally finished stage of cement production line. This phase will add the cement clinker with proper amount of mixed materials to be grinded for cement finished product


Cement Grinding Station Working Video

Main Equipment:  Cement grinding station is composed of storage bins, belt scales, cement mills, powder separators, bucket elevators, packaging scales, dust collectors, belt conveyor, spiral conveyor, etc.

Applied Materials: Stone powder, limestone, bauxite, aluminum hydroxide, cement clinker, slag, fly ash, coal gangue and other industrial waste residues, etc.

Working principle of Cement Grinding Station:

Silicate cement production technology is representative in the cement production, is a limestone and clay as the main raw material, through crushing, ingredients, which takes limestone and clay as the main raw materials, through crushing, burdening, grinding to fine particles to get the raw meal, then feeds into the cement kiln to calcination to get the cement clinker, mix some gypsum into the clinker(sometime with mixed materials and admixture) to grind Portland cement.


Main equipment of Cement Grinding Station: 

1. Grinding Mill: Cement Ball mill, 

2. Feeding Machines: Apron Feeder, Impeller Feeding machine, Magnetic Vibrating Feeding Machine, ect.

3. Conveying Equipments:  Bucket Elevator, Belt Conveyor, Chain Conveyor, ect.

4. Crushers: Jaw Crusher, Hammer Crusher, Impact Crusher ect.

5. Dust Collectors / Dust Filters: Bag type Dust Collector / dusct filter, Pulse bag Dust Collector, Air box type pulse bag dusct collector, ect .

6. High effecient powder separator: High Efficient Horizontal whirling-fluid Powder Separator, Centrifugal powder separator/ concentrator, cyclone powder concentrator, ect.

7. Packing Machines:  Automatic Cement Packing Machine, 1-12 spouts cement bag rotary packing machine, ect. 


The difference between cement grinding station and cement plant: 

1. Procedure: The mud grinding station only has a cement mill system and packaging sales; while the cement plant includes a full set of production lines such as mining, raw material grinding, clinker making, cement grinding, packaging and sales.

2. The nature of the factory: The cement grinding station is a cement product production unit that separates the final product stage of cement production; the cement plant includes the complete cement production process.

3. Processing characteristics: During the processing stage of the cement grinding station, the cement clinker is added to the appropriate amount of mixed materials for powdering to produce finished cement; the production of cement plants generally can be divided into three processes: raw meal preparation, clinker calcination and cement production.


Customer Site of Fote Cement Grinding Station


Contact us

Our sales team is available to respond to any queries you might have on Fote. Get in touch using the details below:

High and New Industrial Zone, Kexue Revenue, ZhengZhou, China.

info@sinoftm.com

Technical Data

Product
specification
(m)
Milling form Production
capacity
(t/h)
Φ1.83×7 Open flow 6.5-8
Φ2.2×7.5 Open flow 8-10
Φ2.2×11 Open flow 12-13
Φ2.2×13 Open flow 16-18
Φ2.4×13 Open flow 20-23
Φ2.6×13 Open flow 28-32
Φ3×9 Circle flow 28-36.5
Φ3×11 Circle flow 36-47
Φ3.2×13 Open flow 45-50
Φ3.5×13 Circle flow 60-65
Φ3.8×13 Open flow 60-62
Φ4.2×13 Open flow 85-87
Φ4.6×14 Circle flow 120-135

Our Customer

FTM has equipment installed throughout the world in are as such as South Africa, Middle East, West Asia,India, Philippines, Western Europe, Southeastern Asia.

Request a Quote

Get the minimum offer free of charge, please fill in the following information to tell us (confidential information, not open to the public)

productname
email
telephone
country
message
Service Surpport

Whatever your requirements, you 'll find the perfect service-oriented solution to match your specific needs with our help.

  • 30 seconds for connecting customer service

  • 30 minutes for getting technical answer

  • 24 hours for getting free solution plan

TOP
Copyright© 2018 Fote Heavy Machinery. All rights reserved.Privacy Policy